The following overview gives you an idea of the steps done by Pacific Constructions when erecting a prefab building.

  1. The engineering of the prefab building takes places in our factory.



    Engineering in the Factory



  2. The knocked down elements are shipped in container either directly to project-site, or reloaded at the nearest harbour for further ground transport.



    Shipping of knocked-down prefab building.



  3. Ideally, site preparation has alredy been accomplished, this includes foundation. The two choices are stilts or a concrete slab.



    Foundation






  4. Everything is ready for the assembling of the prefab building.



    Assembling forg lift


    opening up of the packaging


    assembling detail



  5. Assembling overseen and conducted by our engineers...



    Our engineer



  6. with the help of local workers.



    local worker



  7. First, posts and beams.



    Columns



  8. Second, walls.



    Assembling Walls




  9. Third, ceiling.



    Assembling Ceiling




  10. Fourth, roof.


    Assembling roof



  11. Details.



    Assembling Details


    Assembling Details


    Assembling Details




  12. The complete building.



    Assembling complete



  13. Nice weather, a pool and sunloungers as decoration.



    finished

This overview skipped important work such as electricity, sanitation, water, insulation and the like.
services | timber | planning | projects | news | blog | gazebos | profile | home | contact
(C) 2008 Pacific Constructions
Prefab Houses | Prefabricated Hosues | Prefab Homes | Prefabricated Homes | Prefab Buildings | Prefabricated Buildings